12 KiB
Contributing Guidelines
The Kubernetes Helm project accepts contributions via GitHub pull requests. This document outlines the process to help get your contribution accepted.
Reporting a Security Issue
Most of the time, when you find a bug in Helm, it should be reported using GitHub issues. However, if you are reporting a security vulnerability, please email a report to helm-security@deis.com. This will give us a chance to try to fix the issue before it is exploited in the wild.
Contributor License Agreements
We'd love to accept your patches! Before we can take them, we have to jump a couple of legal hurdles.
The Cloud Native Computing Foundation (CNCF) CLA must be signed by all contributors. Please fill out either the individual or corporate Contributor License Agreement (CLA).
Once you are CLA'ed, we'll be able to accept your pull requests. For any issues that you face during this process, please add a comment here explaining the issue and we will help get it sorted out.
NOTE: Only original source code from you and other people that have signed the CLA can be accepted into the repository. This policy does not apply to third_party and vendor.
Support Channels
Whether you are a user or contributor, official support channels include:
- GitHub issues
- Slack: #Helm room in the Kubernetes Slack
Before opening a new issue or submitting a new pull request, it's helpful to search the project - it's likely that another user has already reported the issue you're facing, or it's a known issue that we're already aware of.
Milestones
We use milestones to track progress of releases. There are also 2 special milestones
used for helping us keep work organized: Upcoming - Minor
and Upcoming - Major
Upcoming - Minor
is used for keeping track of issues that aren't assigned to a specific
release but could easily be addressed in a minor release. Upcoming - Major
keeps track
of issues that will need to be addressed in a major release. For example, if the current
version is 2.2.0
an issue/PR could fall in to one of 4 different active milestones:
2.2.1
, 2.3.0
, Upcoming - Minor
, or Upcoming - Major
. If an issue pertains to a
specific upcoming bug or minor release, it would go into 2.2.1
or 2.3.0
. If the issue/PR
does not have a specific milestone yet, but it is likely that it will land in a 2.X
release,
it should go into Upcoming - Minor
. If the issue/PR is a large functionality add or change
and/or it breaks compatibility, then it should be added to the Upcoming - Major
milestone.
An issue that we are not sure we will be doing will not be added to any milestone.
A milestone (and hence release) is considered done when all outstanding issues/PRs have been closed or moved to another milestone.
Issues
Issues are used as the primary method for tracking anything to do with the Helm project.
Issue Types
There are 4 types of issues (each with their own corresponding label):
- Question: These are support or functionality inquiries that we want to have a record of for future reference. Generally these are questions that are too complex or large to store in the Slack channel or have particular interest to the community as a whole. Depending on the discussion, these can turn into "Feature" or "Bug" issues.
- Proposal: Used for items (like this one) that propose a new ideas or functionality that require a larger community discussion. This allows for feedback from others in the community before a feature is actually developed. This is not needed for small additions. Final word on whether or not a feature needs a proposal is up to the core maintainers. All issues that are proposals should both have a label and an issue title of "Proposal: [the rest of the title]." A proposal can become a "Feature" and does not require a milestone.
- Features: These track specific feature requests and ideas until they are complete. They can evolve from a "Proposal" or can be submitted individually depending on the size.
- Bugs: These track bugs with the code or problems with the documentation (i.e. missing or incomplete)
Issue Lifecycle
The issue lifecycle is mainly driven by the core maintainers, but is good information for those contributing to Helm. All issue types follow the same general lifecycle. Differences are noted below.
- Issue creation
- Triage
- The maintainer in charge of triaging will apply the proper labels for the issue. This includes labels for priority, type, and metadata (such as "starter"). The only issue priority we will be tracking is whether or not the issue is "critical." If additional levels are needed in the future, we will add them.
- (If needed) Clean up the title to succinctly and clearly state the issue. Also ensure that proposals are prefaced with "Proposal".
- Add the issue to the correct milestone. If any questions come up, don't worry about adding the issue to a milestone until the questions are answered.
- We attempt to do this process at least once per work day.
- Discussion
- "Feature" and "Bug" issues should be connected to the PR that resolves it.
- Whoever is working on a "Feature" or "Bug" issue (whether a maintainer or someone from the community), should either assign the issue to them self or make a comment in the issue saying that they are taking it.
- "Proposal" and "Question" issues should stay open until resolved or if they have not been
active for more than 30 days. This will help keep the issue queue to a manageable size and
reduce noise. Should the issue need to stay open, the
keep open
label can be added.
- Issue closure
How to Contribute a Patch
- If you haven't already done so, sign a Contributor License Agreement (see details above).
- Fork the desired repo, develop and test your code changes.
- Submit a pull request.
Coding conventions and standards are explained in the official developer docs: https://github.com/kubernetes/helm/blob/master/docs/developers.md
The next section contains more information on the workflow followed for PRs
Pull Requests
Like any good open source project, we use Pull Requests to track code changes
PR Lifecycle
- PR creation
- We more than welcome PRs that are currently in progress. They are a great way to keep track of important work that is in-flight, but useful for others to see. If a PR is a work in progress, it must be prefaced with "WIP: [title]". Once the PR is ready for review, remove "WIP" from the title.
- It is preferred, but not required, to have a PR tied to a specific issue.
- Triage
- The maintainer in charge of triaging will apply the proper labels for the issue. This should
include at least a size label,
bug
orfeature
, andawaiting review
once all labels are applied. See the Labels section for full details on the definitions of labels - Add the PR to the correct milestone. This should be the same as the issue the PR closes.
- The maintainer in charge of triaging will apply the proper labels for the issue. This should
include at least a size label,
- Assigning reviews
- Once a review has the
awaiting review
label, maintainers will review them as schedule permits. The maintainer who takes the issue should self-request a review. - Reviews from others in the community, especially those who have encountered a bug or have requested a feature, are highly encouraged, but not required. Maintainer reviews are required before any merge
- Any PR with the
size/large
label requires 2 review approvals from maintainers before it can be merged. Those withsize/medium
are per the judgement of the maintainers
- Once a review has the
- Reviewing/Discussion
- Once a maintainer begins reviewing a PR, they will remove the
awaiting review
label and add thein progress
label so the person submitting knows that it is being worked on. This is especially helpful when the review may take awhile. - All reviews will be completed using Github review tool.
- A "Comment" review should be used when there are questions about the code that should be answered, but that don't involve code changes. This type of review does not count as approval.
- A "Changes Requested" review indicates that changes to the code need to be made before they will be merged.
- Reviewers should update labels as needed (such as
needs rebase
)
- Once a maintainer begins reviewing a PR, they will remove the
- Address comments by answering questions or changing code
- Merge or close
- PRs should stay open until merged or if they have not been active for more than 30 days.
This will help keep the PR queue to a manageable size and reduce noise. Should the PR need
to stay open (like in the case of a WIP), the
keep open
label can be added.
- PRs should stay open until merged or if they have not been active for more than 30 days.
This will help keep the PR queue to a manageable size and reduce noise. Should the PR need
to stay open (like in the case of a WIP), the
Documentation PRs
Documentation PRs will follow the same lifecycle as other PRs. They will also be labeled with the
docs
label. For documentation, special attention will be paid to spelling, grammar, and clarity
(whereas those things don't matter as much for comments in code).
The Triager
Each week, one of the core maintainers will serve as the designated "triager" starting after the public standup meetings on Thursday. This person will be in charge triaging new PRs and issues thoughout the work week.
Labels
The following tables define all label types used for Helm. It is split up by category.
Common
Label | Description |
---|---|
bug |
Marks an issue as a bug or a PR as a bugfix |
critical |
Marks an issue or PR as critical. This means that addressing the PR or issue is top priority and will be handled first by maintainers |
docs |
Indicates the issue or PR is a documentation change |
duplicate |
Indicates that the issue or PR is a duplicate of another |
feature |
Marks the issue as a feature request or a PR as a feature implementation |
keep open |
Denotes that the issue or PR should be kept open past 30 days of inactivity |
refactor |
Indicates that the issue is a code refactor and is not fixing a bug or adding additional functionality |
Issue Specific
Label | Description |
---|---|
help wanted |
This issue is one the core maintainers cannot get to right now and would appreciate help with |
proposal |
This issue is a proposal |
question/support |
This issue is a support request or question |
starter |
This issue is a good for someone new to contributing to Helm |
wont fix |
The issue has been discussed and will not be implemented (or accepted in the case of a proposal) |
PR Specific
Label | Description |
---|---|
awaiting review |
The PR has been triaged and is ready for someone to review |
breaking |
The PR has breaking changes (such as API changes) |
cncf-cla: no |
The PR submitter has not signed the project CLA. |
cncf-cla: yes |
The PR submitter has signed the project CLA. This is required to merge. |
in progress |
Indicates that a maintainer is looking at the PR, even if no review has been posted yet |
needs pick |
Indicates that the PR needs to be picked into a feature branch (generally bugfix branches). Once it has been, the picked label should be applied and this one removed |
needs rebase |
A helper label used to indicate that the PR needs to be rebased before it can be merged. Used for easy filtering |
picked |
This PR has been picked into a feature branch |
Size labels
Size labels are used to indicate how "dangerous" a PR is. The guidelines below are used to assign the
labels, but ultimately this can be changed by the maintainers. For example, even if a PR only makes
30 lines of changes in 1 file, but it changes key functionality, it will likely be labeled as size/large
because it requires sign off from multiple people. Conversely, a PR that adds a small feature, but requires
another 150 lines of tests to cover all cases, could be labeled as size/small
even though the number
lines is greater than defined below.
Label | Description |
---|---|
size/small |
Anything less than or equal to 4 files and 150 lines. Only small amounts of manual testing may be required |
size/medium |
Anything greater than size/small and less than or equal to 8 files and 300 lines. Manual validation should be required. |
size/large |
Anything greater than size/medium . This should be thoroughly tested before merging and always requires 2 approvals. This also should be applied to anything that is a significant logic change. |